Intel to launch Skylake-D in Q1 2018, followed by Xeons with integrated FPGA

Over the last week, Intel has given out series of slides to publishers which compares Skylake-SP to Naples. Embedded in those slides we found a number of other interesting confirmations.

Skylake-based Xeon-D

The key slide is shown with the bullet highlighted.

 

Future updates from the Intel’s slide deck

We now have confirmation that Skylake-D is coming in “early 2018” which we are interpreting as first quarter (likely January-February timeframe). Those parts are particularly interesting because they fill the gap between the Atom server parts (Denverton) and the high-performance Xeons (Skylake-SP).

Prior Xeon-D parts were based on Broadwell (Broadwell-DE) which incorporated anywhere from 4 to 16 cores at low TDPs (35 W to 65 W). We expect to see similar TDPs from the upcoming Skylake-based SKUs. Currently those Broadwell models go up to 16 cores. Higher core-count parts should come with this release; at least up to 18 cores which would be the Skylake high core count (HCC) die.

Higher core-count Xeon-D parts based on Skylake should better position Intel against the Centriq family of ARM server processors which were recently launched by Qualcomm.

Xeon with Integrated FPGA

The same slide made a passing mention that we can expect to Xeon Scalable processors with integrated FPGAs after the Xeon D release. It’s worth noting that no tentative date was given meaning it could be late 2018 or even 2019. We do believe the initial release will happen in 2018.

 
 



Spotted an error? Help us fix it! Simply select the problematic text and press Ctrl+Enter to notify us.

Spelling error report

The following text will be sent to our editors: